In blocks of flats that have a ‘narrow cavity’ (40mm) wall to the un-heated corridor, can the ‘narrow cavity’ to the UHC be filled with expanded polystyrene beads to satisfy PAS2035 and be signed off as compliant or can the narrow cavity be insulated with EWI directly? Will the UHC be considered a fail if left uninsulated?

Share:
Share:

Leave a Reply

T: 0330 055 7629
E: info@retrofitacademy.org
A: Barn 4, Dunston Business Village,
Stafford Road, Stafford, ST18 9AB

Terms & Conditions 
Policies & Procedures

Copyright © 2022 The Retrofit Academy. All rights reserved

Website by